Train Orders

Page 1


    Reference: TGE0013a
Collection: Elias Collection
Description: T.O. #40 - Jan. 22, 1920
 
"Run slow and carefully over bridge 75A - 84B and first bridge north of Rider Spur. Reduce speed to six miles per hour over bridge 82B and bridge 118-6 first bridge north of Beatty.
Do not exceed twelve miles per hour over first curve south of BG-MP 136."

Reference: TGE0014a
Collection: Elias Collection
Description: T.O. #1 - Mar. 22,1921
 
"Engine 6 run extra Goldfield to Ralston and return to Goldfield with right over all trains."

Reference: TGE0015a
Collection: Elias Collection
Description: T.O. #1 - Nov. 4, 1921 - Now includes the DVRR
 
"Reduce speed to Scheduled times between Goldfield and BG mile post 189.   30 miles per hour between BG mile post 189 and Beatty and 8 miles per hour over bridge 16(?)B and 80E on TT."

Reference: TGE0016a
Collection: Elias Collection
Description: T.O. #2 - Apr. 19,1922
 
"Engine 7 run Extra Goldfield to Bonnie Claire meet No. 9 at Bonnie Claire and help them to Goldfield."

Page 1

TiesBack UpTiesImage IndexTiesTTRR ContentsTies
02/02/2002